The objective of the
project is to expand the system to a multi-light capability that can
cover a larger repaired area. The team will determine the need for and
specify the requirements for a larger transformer (possibly of special
design or specifications), single or multiple capacitors and igniters,
and an appropriate means of controlling the combinations based potential
customers’ facilities.
Subscribe to:
Post Comments (Atom)
Blog Posts
-
►
2018
(5)
- ► 02/25 - 03/04 (3)
- ► 02/18 - 02/25 (2)
-
►
2017
(21)
- ► 10/29 - 11/05 (5)
- ► 10/22 - 10/29 (2)
- ► 10/15 - 10/22 (14)
-
▼
2013
(64)
- ► 02/17 - 02/24 (1)
- ▼ 02/03 - 02/10 (6)
- ► 01/27 - 02/03 (6)
- ► 01/20 - 01/27 (24)
- ► 01/13 - 01/20 (27)
-
►
2012
(15)
- ► 12/30 - 01/06 (12)
- ► 12/23 - 12/30 (3)
0 comments:
Post a Comment